Internal Systems Report Sept 2005
Not much to report, a lot is still on hold pending a donation that's on hold (Rob to look at when he's back).
A new toast and omnivorous have been installed, both just need to be configured. I need to arrange a day with Rob, and probably Con where we can get these done.
Julian Goodwin




